Pentair ETi 400 ASME Commercial Heater Manual
ETi® 400 HIGH EFFICIENCY HEATER - INSTALLATION AND USER’S GUIDE
Download Manual in English
Download Manual in French
Download Manual in Spanish
Warning and Safety Information |
5 |
Important Notices |
5 |
Heater Application Information | 5 |
Code Requirements |
6 |
Consumer Information and Safety Information |
6-8 |
Heater Identification Information |
9 |
Section 1. Operation Instructions |
10 |
Operator Control Panel |
10-11 |
Basic System Operation |
11 |
Heater DSI Electronic Ignition Lighting/Operation |
11 |
Start-Up Operation | 12 |
Putting the Heater Into Service |
12 |
Heater Operating Instructions |
13 |
To Turn Off Gas to the Appliance |
13 |
Safety Controls (Air Flow Switches, Water Pressure Switches, High Limit Shut-Off Switches) |
14-15 |
Ignition Module Operation | 15 |
Section 2. Installation | 16 |
Heater Description | 16 |
Putting the Heater into Service |
16 |
Sequence Of Operation | 17 |
Specifications |
17-18 |
Plumbing Connections | 19 |
Water Connections |
19 |
Valves |
20 |
Manual By-Pass |
20 |
Below Pool Installation | 20 |
Gas Connections |
21 |
Gas Pipe Sizing |
21 |
Gas Pressure Testing | 22 |
Checking Gas Pressure Through Gas Control Valve |
22 |
Sediment Traps |
23 |
Outdoor Installation (US and Canada) |
24-26 |
Outdoor Installation Venting Guidelines |
27 |
Heater Clearances - Outdoor | 27 |
Indoor Venting — General Requirements (Category IV Vertical and Horizontal requirements) | 27 |
Heater Clearances — General Requirements (Indoor and Outdoor Installation for US and Canada) |
27 |
Direct Air Intake Cover | 27 |
Combustion Air Supply |
28 |
Air Supply Requirements Guide for the ETi 400 Heater |
28 |
Direct Air Intake Exhaust Duct using 4-inch PVC Pipe (Indoor Installation) | 29-35 |
Direct Air Intake Kit Installation (Combustion Air Supply) | 30 |
Corrosive Vapors and Possible Causes | 31 |
Horizontal or Vertical Venting (Category IV) - Positive Pressure |
32 |
Vent Installation (Indoor Installation for U.S. or Outdoor Shelter for Canada) | 33 |
Direct Vent Requirements |
33-34 |
Direct Vent - Horizontal Through- the-Wall (Termination) |
35 |
Vent Installation - Indoor Installation (US and Canada) |
35 |
Garage or Utility Room Installation (Vent Installation - Indoor Installation US and Canada) |
36 |
Final Installation Check |
36 |
Condensate Management (Maintenance, Condensate Neutralizer Cartridge Drain/Tubing Installation) |
37 |
Electrical Connections |
38 |
Bonding |
38 |
120 VAC/240 VAC Wiring | 39 |
Remote Control Connections | 40 |
Fireman's Switch Connection | 31 |
Heater Connection Wiring Diagram Causes | 41 |
Heater Ladder Wiring Diagram | 42 |
Section 3. Troubleshooting |
43 |
Initial Troubleshooting and Error / Fault Codes |
43 |
Initial Troubleshooting Chart | 5 |
Code Requirements |
44 |
Heater Will Not Fire A |
45 |
Heater Will Not Fire B |
46 |
Diagnostics LEDs: PS, HLS, TF, IGN, AFS, AG1, AG2, FS |
47-51 |
Burner Troubleshooting |
52 |
Heat Exchanger Troubleshooting |
52 |
Operator Control Panel Displays RNC Code |
52 |
Section 4. Maintenance and Care Instruction |
53 |
Care and Maintenance |
53 |
TitanTough Heat Exchanger Assemblies Annual Inspection |
53 |
Burner Spark Electrode and Flame Sensor Rod Annual Inspection |
54 |
Pressure Relief Valve (50 psi) |
54 |
After Start-Up |
55 |
Spring and Autumn |
55 |
Winter Operation and Winterization |
55 |
Return the Heater to Service |
56 |
Maintaining Pool Temperature |
56 |
Section 5. Heater Replacement Parts |
59-65 |
Heater Replacement Parts List |
60 |
General Replacement Parts List |
60 |
Heater Heat Exchanger and Blower Assemblies Replacement Parts |
63 |
Heater Manifold Assembly - Inlet and Outlet Assembly Replacement Parts |
63 |
Heater Condensate and Exhaust Assembly Replacement Parts |
64 |
Heater Operator Control Panel Assembly Replacement Parts |
65 |
Download